Documents

8 pages
51 views

Section 01 - Part 11 - Engineer’s Site Facilities.docx

of 8
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Share
Description
QCS 2010 Section 1 Part 11 Engineer’s Site Facilities Page 1 11. ENGINEER’S SITE FACILITIES .................................................................... 2 11.1 GENERAL ...................................................................................................... 2 11.1.1 Scope 2 11.2 ENGINEER’S SITE OFFICES
Transcript
  QCS 2010 Section 1 Part 11 Engineer’s  Site Facilities Page 1 QCS 2010   iIMPERIALTRADING &CONTRACTING CO.W.L.L(ITCC)   11. ENGINEER’S SITE  FACILITIES .................................................................... 2 11.1 GENERAL ...................................................................................................... 2 11.1.1 Scope 2 11.2 ENGINEER’S SITE  OFFICES........................................................................ 2 11.2.1 General 2 11.2.2 Type 1 Offices 2 11.2.3 Type 2 Offices 3 11.2.4 Car Parking Facilities 5 11.3 UTILITY CONNECTIONS .............................................................................. 5 11.3.1 General 5 11.3.2 Electricity 5 11.3.3 Water 5 11.3.4 Telephone 5 11.3.5 Internet 5 11.4 PROVISION OF EQUIPMENT AND SUPPLIES ............................................ 6 11.4.1 General 6 11.4.2 Computers and Scanners/Printers 6 11.4.3 Photocopier 6 11.4.4 Measuring and Recording Equipment 6 11.4.5 Stationary Supplies 7 11.4.6 Safety Equipment and Clothing 7 11.4.7 Telephones and Facsimile Machines 7 11.5 ATTENDANCE............................................................................................... 7 11.5.1 Assistance to the Engineer 7 11.5.2 Contract Administration 8  QCS 2010 Section 1 Part 11 Engineer’s  Site Facilities Page 2 QCS 2010   iIMPERIALTRADING &CONTRACTING CO.W.L.L(ITCC)   11. ENGINEER’S  SITE FACILITIES   11.1 GENERAL   11.1.1 Scope  1 This Part specifies the requirements for the Engineer’s  temporary site facilities and includes site offices, utility connections, provision of equipment and supplies and attendance. 2 Related Sections and Parts are as follows This Section Part 10 Health and Safety Part 13 Setting Out of the Works 11.2 ENGINEER’S SITE OFFICES   11.2.1 General  1 The Contractor shall provide site offices the type and number as stated in the Project Documentation. The position of the site offices shall be to the approval of the Engineer. 2 Upon removal of the site offices, the area occupied or otherwise affected by them shall be reinstated to its srcinal condition. 11.2.2 Type 1 Offices  1 Unless described elsewhere in the Project Documentation the Contractor shall provide, maintain and remove on completion of the Works the Engineer’s site offices described in this Clause. 2 The Contractor shall proceed with the provision of a site office for the exclusive use of the Engineer immediately following the award of the Contract and shall provide temporary alternative accommodation to the Engineer’s  approval until such time as the office is made available. 3 The office shall have a minimum area of 20 m 2 and shall comply with the following: (a) The structure shall be weatherproof. (b) The windows and doors shall be dust-proof and the windows shall be fitted with fly screens. (c) The office shall be air-conditioned to maintain a maximum steady dry bulb temperature of 25ºC at a relative humidity of 50% under the expected climatic conditions expected at the Site. (d) Adequate effective lighting and power outlets shall be installed in accordance with the latest requirements of the Qatar General Electricity & Water Corporation. (e) The walls and ceilings shall be painted with emulsion paint. 4 The office shall be provided with the following furniture to the approval of the Engineer: (a) 1 No. kneehole pattern desk with a total of six lockable drawers, approximately 1500 x 800 x 760 mm in size. (b) 1 No. swivel chair with armrests. (c) 2 No. stacking or folding chairs. (d) 1 No. hanging file or plan chest suitable for AO size prints. (e) 1 No. wastepaper basket. (f) 1 No. two drawer filing cabinet. (g) 1 No. wall mounted pin board, 1000 x 2000 mm in size.  QCS 2010 Section 1 Part 11 Engineer’s  Site Facilities Page 3 QCS 2010   iIMPERIALTRADING &CONTRACTING CO.W.L.L(ITCC)   5 Sanitary and washing facilities shall be provided for the exclusive use of the Engineer and shall include a WC and a wash-hand basin an adequate supply of hot and cold water shall be provided at all times. 6 The Contractor shall insure the site offices against fire, burglary and other risks. 7 The Contractor shall keep on site at all times an adequate supply of clean, fresh, chilled drinking water for the consumption of the Engineer. 8 The Contractor shall maintain the offices in a clean and sanitary condition. 11.2.3 Type 2 Offices  1 The Engineer’s  site offices described in this Clause shall be provided in lieu of Type 1 Offices only where it is a stated requirement of the Project Documentation. 2 The offices shall be portable units, mounted on skids or similar and where directed in the Project Documentation shall become the property of the Government on completion of the Contract. On completion of the Contract, the offices which are to become the property of the Government shall be repaired and redecorated to the satisfaction of the Engineer; they shall then delivered to a location designated by the Engineer within 50 km of the Site. 3 The buildings shall conform to the general configuration shown below. The number of each type of unit shall be as stated in the Project Documentation. 4 The Contractor shall proceed with the provision of the portable offices, which shall be for the exclusive use of the Engineer immediately following the award of the Contract and shall provide temporary alternative accommodation to the Engineer’s  approval until such time as the offices are made available.  QCS 2010 Section 1 Part 11 Engineer’s  Site Facilities Page 4 QCS 2010   iIMPERIALTRADING &CONTRACTING CO.W.L.L(ITCC)   5 The Contractor shall submit to the Engineer for approval a comprehensive specification and drawings showing the accommodation proposed complete with furnishings, equipment and fittings before placing any orders. 6 The units shall be mounted on adequate concrete foundations and shall be provided with concrete access steps where necessary. 7 The units may be constructed of composite timber framed panels with wood or metal cladding, any combination of these, or alternative forms or construction which comply with the following levels of performance: Walls Thermal conductance - 0.60 w/m 2 ºC Fire resistance - ½ hour Roof Thermal conductance - 0.60 m 2 ºC Roof resistance - ½ hour 8 Roof coverings shall be selected for durability, freedom from excessive maintenance, and the ability to withstand extreme exposure to sun, heat and humidity. 9 The units shall be finished internally and externally with low maintenance materials. 10 The offices shall be air-conditioned with wall mounted units to maintain each room at a maximum steady dry bulb temperature of 25ºC at a relative humidity of 50% under the expected climatic conditions expected at the Site. Extract fans capable of 10 air changes per hour shall be provided in the kitchen and toilets. 11 The installation and testing of wiring and electrical equipment in the units shall be in accordance with the latest requirements of the Qatar General Electricity & Water Corporation. 12 Each office shall be provided with the following furniture to the approval of the Engineer: (a) 1 No. kneehole pattern desk with a total of six lockable drawers and approximately 1500 x 800 x 760 mm in size. (b) 1 No. swivel chair with armrests. (c) No. stacking or folding chairs. (d) 1 No. hanging file or plan chest suitable for AO size prints. (e) 1 No. wastepaper basket. (f) 1 No. two drawer filing cabinet. (g) 1 No. wall mounted pin board, 1000 x 2000 mm in size. 13 Each toilet shall be provided with the following sanitary fittings to the approval of the Engineer and an adequate supply of hot and cold water at all times: (a) 1 No. low level WC suite. (b) 1 No. Wash-hand basin. (c) 1 No. shower tray, mixer fittings, rose and shower curtain. (d) 1 No. toilet roll holder, towel rail, soap dish and mirror. (e) a suitable number of cups, saucers and drinking glasses. 14 The samples and meeting room shall be provided with the following furniture to the approval of the Engineer: (a) 2 No. tables, each approximately 1200 x 2000 mm in size. (b) No. folding or stacking chairs. (c) 1 No. wall mounted blackboard, 1000 x 2000 mm in size. (d) 1 No. wall mounted pin board, 1000 x 3000 mm in size. (e) 1 No. shelf unit for approved samples with 5 tiers of shelves 400 mm wide x 2400 mm long overall.
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks