    International Research Journal of Engineering and Technology   (IRJET)   e-ISSN: 2395 -0056   Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072   © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 40  Analysis and feasibility assessment of a roof top grid-connected photovoltaic power system for a Green building G.R.K.D. Satya Prasad 1 , Dr. Jagadish Panda 2 , Lalit kumar barik  3 , Sidharth kumar sahoo  4 , Somesh das 5 , Gupteswar swain 6 , 1  Asscoaite Professor, Department of Electrical Engineering, GIET, Gunupur, Orissa,   INDIA  2  Professor, Department of Computer Science Engineering, GIET, Gunupur, Orissa, INDIA  2,3,4,5  Final Year UG student, Dept. of Electrical Engineering, GIET, Gunupur, Orissa, INDIA ---------------------------------------------------------------------***---------------------------------------------------------------------  Abstract -   Independent solar power generation systems necessity to elevate the design. A verdict sufficient purchase of clean energy for the imminent is one of society’s most overwhelming challenges. Renewable energy sources will  performance a substantial role in a justifiable development of the energy supply in the imminent, due to the negligible impact they are anticipated to have on the environment and their gigantic industrial potential. But on the supplementary hand, it silently requires a great deal of technological and organizational progress before it can contribute substantially to our energy needs in a ecological way. In this project an investigation has being supported out with a 1 kW solar PV system to be mounted and integrated into a Green building. By scrutinizing all factors with simulation software called Homer a comprehensive economic analysis methodology has been suggested. The results obtained are very encourageable to plan for further  forthcoming projects. Key Words : Simulation, Rooftop, Homer, Green buildings, 1. INTRODUCTION A 1 kw solar PV power generation system has been installed in administration block with the following specifications. A complete load survey also conducted to know the load pattern of 1 kw solar PV system. After collecting the data from various sources we have calculated and analyzed the load pattern and load curves of various rooms and checked with HOMER software for accuracy. ENERGY AUDITING AND LOAD SURVEY PROCESS For the installation of solar panel we took energy audit and details have taken by batch No. 10 in order to calculate the number of loads and its power consumption. Here we considered all types of loads such as lights, fans etc. in administration block. Monthly consumption of load for 24hr in a weekday is represented in this T No: 1. This table is prepared by taking accounts of daily class schedule in the college. EE/EEE department working hour starts at 7am and ends at 1pm.So maximum power consumption is taking place in between this time. From 1pm to 3pm lunch break are taken. So there is nil power consumption at that time. Again the department re-opens at 3pm and continues up to 6pm.So at that time there is moderate power consumption is taking place, because in second half there is less class than first half. From 6pm to 7am only one tube-light is glowing for the purpose of lightening the building. By taking the account of monthly wise we observe that there is more power consumption in between February to May due to summer season. From august to December there is moderate power consumption due to winter season and puja vacation. From May to June there is summer vacation, so at that time we consume less power. January, June and July are the months in which exams take place, so less power consumption take place than other months. By analyzing and taking the above data we simulate it through HOMER software. Table 1: Daily load pattern at administration block Hour Load (kW) Hour Load (kW) 00:00 - 01:00 0.000 12:00 - 13:00 0.560 01:00 - 02:00 0.000 13:00 - 14:00 0.100 02:00 - 03:00 0.000 14:00 - 15:00 0.100 03:00 - 04:00 0.000 15:00 - 16:00 0.100 04:00 - 05:00 0.000 16:00 - 17:00 0.560 05:00 - 06:00 0.000 17:00 - 18:00 0.560 06:00 - 07:00 0.000 18:00 - 19:00 0.560 07:00 - 08:00 0.000 19:00 - 20:00 0.300 08:00 - 09:00 0.100 20:00 - 21:00 0.300 09:00 - 0.560 21:00 - 0.100    International Research Journal of Engineering and Technology   (IRJET)   e-ISSN: 2395 -0056   Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072   © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 41 10:00 22:00 10:00 - 11:00 0.560 22:00 - 23:00 0.000 11:00 - 12:00 0.560 23:00 - 00:00 0.000 Modeling the Solar PV system with Homer Fig No. 1 Home page of homer At first we have to click on the add or remove bar for choosing our equipment. A lot of equipment are shown in a window which is appeared like Fig No: 6.1. We have to choose equipment according to our requirements. As per our requirements we take one primary load, one converter, one battery, one PV and a Grid. The below Fig 2will shows how to add or remove equipment for simulating purposes. Primary load input Here we have to first choose type of load. The load type is AC. After that 24 hourly values entered in the load table of every month. Each of 24 values in the load table is the average electric demand for a single hour of the day. The above Fig No. 2 show how the primary load gives result. Fig No. 2 Primary load input PV input PV is one of the equipments we select. Here we have to put size of the PV according to peak load. We have to also enter the cost and replacement value according to the size of PV. Here we got the curve between cost and size. The above Fig No. 3 shows that, its life time is 25 years. Fig No. 3: PV input Battery input Battery is mainly used for backup purpose. Here; we have to choose a battery of appropriate rating which meet our load demand is shown in Fig No. 5.5. After that we have to enter quantity and capital cost to the cost table according to our requirements. Here we get the curve between cost and quantity. We are using battery for back-up supply when there is no grid supply and solar radiation. Fig No. 4 Battery input 4. Converter input A converter may be rectifier or inverter. A converter is required for the system in which DC components serve as AC load and vice versa. Here we have to also enter the cost and size value to the cost table shown in Fig No. 6.6, including labor and hardware installation. Here we get the curve between cost and size. Its lifetime is 15 year. Fig No. 5. Converter input Grid input    International Research Journal of Engineering and Technology   (IRJET)   e-ISSN: 2395 -0056   Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072   © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 42 Grid is infinite bus bar, from where power can be taken according to load demand. Here we take grid into accounts to compensate our peak load demand. After selecting the rate we get a graph in between time of day and rate schedule. Grid input is shown in Fig No. 6. Fig No. 6: Grid input 6. Solar resource input: Fig. 7: Solar Resource at Gunupur Use this window to specify the latitude and the amount of solar radiation available to the photovoltaic (PV) array throughout the year. HOMER uses this data to calculate the output of the PV array each hour of the year. There are double ways to produce baseline records: you can use homer to produce data, or you can ingress hourly radiation data from a file. To synthesize data, you must go in twelve average monthly values of both solar radiation or clearness index. You do not have to enter both; homer analyzes one from the other using the latitude. Enter each monthly cost in the fitting row and support of the solar store table. As you cross the threshold values in the table, homer builds a set of 8,760 solar radiation values, or solitary for each hour of the year. Homer creates the synthesized values with the graham process, which outcomes in a data sequence that partakes genuine day-to-day and hour-to-hour changeability and auto correlation. 2. Final simulation result After putting all the desired data, we go for simulating the project. Finally we got optimization result along with complete report which is shown in Fig No. 6.8. Fig No. 8 Final simulation results SIMULATION OUTPUT REPORT Cost summary Cost summary includes all the expenditure throughout the project. It includes total net present cost; cost of energy and Operating cost details is given. Cost summary also includes cash flow summary which gives detail information about PV, grid, battery and converter net present cost. Here different color shows different net present cost of PV, grid, battery and converter which includes capital, replacement, operating, fuel and salvage cash flow. Electrical power production and consumption    International Research Journal of Engineering and Technology   (IRJET)   e-ISSN: 2395 -0056   Volume: 03 Issue: 06 | June-2016 www.irjet.net p-ISSN: 2395-0072   © 2016, IRJET | Impact Factor value: 4.45 | ISO 9001:2008 Certified Journal | Page 43 Every year we got maximum electrical power from PV array and purchased moderate power from grid to fulfill our load profile. Detail information is given. Below result shows monthly average electric power production in a year. Here PV is represented in yellow color and grid is represented in gray color. Here colors represent PV and grid power consumption in kw every month. Fig No. 9 Monthly average electric production 3. Conclusion Particulars Cost Total system cost 98,000 Rs/- After subsidy 68,6000 Rs/- No. of units generated from solar panel 1527 kwh Each unit rate by considering maximum demand rate and diesel generator option. 9 Rs/- Total revenue from solar power 1527 × 9 = 13, 743 Rs/- year Payback period 7 years (without considering net metering option) Using solar energy at home is becoming increasingly popular. Due to government encouragements and aids on solar systems, the prices of solar panels are becoming more cheap to the everyday purchaser. Home solar power can be used autonomously from a grid system. Surplus electricity made thru the day is stored for night use. More regularly are solar energy systems that are tangled to a grid and trade electricity. In night times and cloudy existences, electricity from the grid is used. In this paper an analysis has being supported out with a 1 kW solar PV system for GIET campus has been installed at administration block. By analyzing all factors with simulation software called Homer a complete economic analysis methodology has been suggested. The results obtained are very encourageable to plan for further future projects. References: 1.   G.R.K.D. Satya Prasad “Kitchen waste based Biomass Plant for Power generation: A case study analysis” International Research journal of Engineering and Technology” Vol. 3, Issue 2, March –  2016 2.   G.R.K.D. Satya Prasad “Assessing the possibility and economical considerations of solar- wind based hybrid power generation in Green buildings” International Research journal of Engineering and Technology” Vol. 3, Issue 2, March –  2016 3.   G.R.K.D. Satya Prasad “Integration of Renewable energy sources in zero Energy buildings with Economical and Environmental aspects by using Homer “ in International journal of advanced engineering sciences and technologies, ISSN:2230-7818,vol-9,Issue No-2,2011; page no: 212-217 4.   G.R.K.D. Satya Prasad “Performance optimization of a Rooftop Hybridized Solar PV-AC grid assisted power system for peak load management” published in International Journal of Engineering Research and  Applications , ISSN:2248-9622, vol-2,Issue No-3,May-june 2012 5.   Bohdanowicz P. and Martinac I., 2002, Thermal Comfort and Energy Saving in the Hotel Industry 6.   SEAV, 2004, Refrigerated Air Conditioning Systems 7.   Australian Department of the Environment, Water, Heritage and the Arts, 2007, Tips for Choosing an Efficient Air Conditioner 8.   US Department of Energy, 1999, Energy Efficient Air Conditioning 9.   T.Y. Chen, Y.M. Chen, F.W.H. Yik, Rational selection of near-extreme coincident weather data with solar irradiation for risk-based air-conditioning design, Energy and Buildings 39 (2007) 1193 – 1201.
Related Documents
View more...
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x